PMT Quality Control Summary
Jeudi 22 Mai 2025
  Accueil Inscription Hamamatsu Company Informations Laboratoire Test Sites Access PMT Database Access PMT and Batch QC sheets News of PMT QC control Summary
PMTS ANALYSIS
STEP1 STEP2
batch #1
batch #2
batch #3
batch #4
batch #5
batch #6
batch #7  
batch #8  
batch #9  
batch #10  
 
Analysis ONLINE



Batch #3 (STEP1)
 
Analysis Summary Statistics Summary


  • The mean value for each sub-batches is above 18.0%. No tube has a value lower than 15%.

 Next
Batch #3 : 750 PMTS
(three sub-batches)
tested by
  1. Valencia (250 PMTS)
  2. Pisa (250 PMTS)
  3. Urbana (250 PMTS)